We buy cable from demolition clearance.
Cable is worth the most in the week before the excavator arrives and the least the morning after. Stripping it out is a scheduling problem before it is a material problem.

Send the reel list. A buyer reads it.
Six details are enough to start. Tags and photos can follow by text or email once a buyer has looked at the basics.
- A buyer reviews the lot: construction, footage and condition, not only metal weight
- Copper and aluminium, 600 V building wire through 345 kV cable
- Full reels, partial reels, cut lengths, pallets and truckloads
- No fee, no obligation, and no automatic pickup
Reel list · Demolition
Reviewed by a buyerTell us what you have and where it sits. Nothing is moved until written lot terms are agreed.
Demolition runs on a sequence: abatement, then soft strip, then structural removal. Cable lives in the soft strip, and it has to come out while there is still a building to walk through. A crew that reaches the cable after the ceilings are down and the walls are pushed is picking through debris, and the value leaves with the debris.
The lot from a good strip is mixed by nature: service entrance at the switchgear, feeder in the risers, tray cable above the ceiling, branch circuits in the walls and a pile of cords and leads from the shop. Separating copper from aluminum, and cable from scrap, is the difference between a load and a sorting job.
Strip before you push
The economics of a demolition job sit in the days, not the weeks. Every hour a machine waits is money gone, and cable removal is slow manual work that holds the sequence up when it is left to the end. Crews that do well at this treat the strip as a scheduled phase with its own labour, not as something to pick up when there is a gap.
- Service entrance and switchgear feeder at the point of entry
- Riser and busway feeder between floors
- Tray and conduit runs above ceilings and in plant rooms
- Branch circuit conductor pulled back to the panel
- Welding leads, cords and portable cable from shop areas
Scheduling against the demolition sequence
Agree the pickup date against the sequence, not the calendar. A strip that finishes on a Tuesday and a machine that arrives on a Wednesday leave no room to load. The workable pattern is to stage the cable to a laydown area outside the push zone, keep it on pallets, and have the truck come while the building is still standing and the gate still takes a trailer.
- Strip date, agreed with the demolition foreman
- Laydown area, outside the push zone
- Gate hours that still accept a trailer
- A named person who signs the load out
Contamination and mixed loads
Demolition cable comes with things attached: conduit, straps, tape, fire caulk, insulation, dust and sometimes material that has to be handled by an abatement crew before anyone else touches it. A load visibly coated in mastic or lagging will be treated as contaminated until it is proven otherwise, and that is a delay rather than a rejection. Cut the ends clean and keep the cable off the floor.
Copper and aluminum do not travel in the same pile
They can ride in the same truck, but not in the same heap. Copper conductor and aluminum conductor are bought on different bases, and a mixed load has to be sorted at the yard before it can be weighed properly. Where the strip is large enough, two roll-offs or two pallet groups make the whole job simpler: copper in one, aluminum in the other, and a third for the steel and the material that is neither.
| Location | What is usually there | How it comes out |
|---|---|---|
| Main switchgear room | Service entrance and feeder | Cut at the lugs, coiled |
| Riser shafts | Feeder and busway | Pulled, or cut in floor sections |
| Above ceilings | Tray, MC, branch circuits | Stripped with the ceiling grid |
| Mechanical rooms | Motor feeder and control | Disconnected, then pulled |
| Shop and yard | Welding leads and cords | Rolled and banded by hand |
Answers before you send anything.
If your question is not here, call the desk. A buyer answers, not a call centre.
The building comes down next week. Is it too late?
Not if the strip has not started. What matters is whether the cable can still be reached and staged outside the push zone. If the ceilings are already down the lot is still buyable, but it will be read as mixed recovery rather than as cable.
Can the roll-off go straight to you?
A roll-off is the right container for a strip and the wrong one for cable, because the cable ends up under everything else. If it has to go in a roll-off, load it last or keep it in the front third so it can be lifted out cleanly.
Does armoured cable count as copper?
It counts as copper with work attached. The armour has to be separated from the conductor, and the value of the whole piece reflects that. Loose MC and BX in a heap is still worth buying, but it is bought as a sorting job.
What if the site has no power for a forklift?
Then the load is planned around that: a lift gate, a ramp, carrying to the curb, or staging next door with the owner's permission. Say what equipment is on site when the pickup is booked, not when the truck is already at the gate.
Related pages
You have the cable. We have a scale and a check.
Send the reel list, the tags or a photograph of the pallet. A buyer comes back with what the lot is worth and how pickup would work, before anything is moved.
954-740-1983 Call or text
- Reel tags, or the print on the jacket
- Reel count and footage, even roughly
- Where it sits and what can reach it
- Whether the cable is still energised